Home  »  Beratung + Bauplanung  »  Project Examples  »  Waste Heat Utilization from Waste Water Treatment Plant for BATA Site

Waste Heat Utilization from Waste Water Treatment Plant for BATA Site


Project 

  • Construction of new energy unit for site with waste heat utilization from neighbouring waste water treatment plant via “cold long-distance energy” and heat pump system  
  • Integration of the unit in the new Hall 8   


Helbling services  

  • Study of the site energy concept with comparison of options 
  • Project planning and realization support for the complete energy supply and energy distribution
  • Project planning for new compressed air supply and incorporation into the energy concept through waste heat utilization 
  • Renovation of media distribution systems Hall 10   


Key project figures  

  • Waste heat utilization capacity from waste water treatment plant 1,500 kW 
  • Transmission line length 500 m 
  • Heat pump capacity 2 x 450 kW 
  • Boiler capacity 1 x 1,100 kW 
  • Heating / energy construction costs CHF 1,300,000 
  • Project duration: 2007 - 2008 

 

Customer: Jakob Müller Immobilien AG

« back

Dipl. Ing. HLK HTL Bruno Hofer
Contact

 