Home  »  Beratung + Bauplanung  »  Project Examples  »  Paper Factory, Utzenstorf

Paper Factory, Utzenstorf

 

Project  

 

  • To analyze energy and processes at the Utzenstorf factory, including the two paper machines Mona and Lisa
  • To draw up an action plan to reduce energy costs and CO2 emissions  

Helbling Services  

 

  • Conducting overall study, including energy analysis and optimization with pinch method and technical process optimization
  • Drawing up action plan, including economic viability calculation and planning of measures  
  • Drafting hot water optimization concept aimed at optimizing both processes for paper machines and steam production
  
Key project figures  

 

  • Construction cost: approx. CHF 1.5 million 
  • Implementation: June to December 2007 (see adjacent photos), further implementation projects planned  
  • Energy saving achieved: approx. 10 GWh or CHF 0.9 million p.a., total potential of approx. 30 GWh p.a. 
  • Previous fossil fuel energy consumption: approx. 300 GWh or CHF 18 million p.a.  

 

Customer: Papierfabrik Utzenstorf

« back