Paper Factory, Utzenstorf

- To analyze energy and processes at the Utzenstorf factory, including the two paper machines Mona and Lisa
- To draw up an action plan to reduce energy costs and CO2 emissions
Helbling Services
- Conducting overall study, including energy analysis and optimization with pinch method and technical process optimization
- Drawing up action plan, including economic viability calculation and planning of measures
- Drafting hot water optimization concept aimed at optimizing both processes for paper machines and steam production
Key project figures
- Construction cost: approx. CHF 1.5 million
- Implementation: June to December 2007 (see adjacent photos), further implementation projects planned
- Energy saving achieved: approx. 10 GWh or CHF 0.9 million p.a., total potential of approx. 30 GWh p.a.
- Previous fossil fuel energy consumption: approx. 300 GWh or CHF 18 million p.a.
Customer: Papierfabrik Utzenstorf