Metsä Tissue GmbH
Project
- Energy audit and process analysis of a tissue production plant
- Planning of measures to reduce energy and production costs
Helbling services
- Overall study incl. energy analysis and optimization using the Pinch analysis method, technical process optimization
- Determining measures incl. profitability calculation and the planning of measures
- Optimization concept with regard to paper machinery and water circulation
Key project figures
- Production of 26,000 t of paper per year with 8,300 operating hours per year
- Economic savings measures with payback < 2.0 years of more than EUR 420,000 per year or approx. 20% of the thermal energy consumption
- Study 2009
Customer: Metsä Tissue GmbH

