Home  »  Beratung + Bauplanung  »  Project Examples  »  Metsä Tissue GmbH

Metsä Tissue GmbH

   

Project  

  • Energy audit and process analysis of a tissue production plant 
  • Planning of measures to reduce energy and production costs  

 

Helbling services 
  • Overall study incl. energy analysis and optimization using the Pinch analysis method, technical process optimization
  • Determining measures incl. profitability calculation and the planning of measures 
  • Optimization concept with regard to paper machinery and water circulation   

Key project figures
 
  • Production of 26,000 t of paper per year with 8,300 operating hours per year 
  • Economic savings measures with payback < 2.0 years of more than EUR 420,000 per year or approx. 20% of the thermal energy consumption 
  • Study 2009 

 

Customer: Metsä Tissue GmbH

« back

Raymond Morand
Contact

 
Personal tools